Moon News  
China Likely To Launch Moon Probe Next April

File image of Luan Enjie, director of the China National Space Administration
by Staff Writers
Beijing (SPX) May 19, 2006
China's first lunar satellite may be launched during a fly-by mission in April in 2007, said Luan Enjie, director of the China National Space Administration on Tuesday, May 16.

"The first lunar orbiter which has been under construction from early 2006 is expected to be tested at the space launch center in December. And the orbiter will be launched next April if everything functions well", the Wuhan-based Changjiang Daily quoted Luan as saying.

The moon probe project will achieve three firsts for space exploration. The lunar orbiter will finish the five-hour fly-by without detection from the ground, it will receive signals from the moon using the world's smallest antenna and it will find the best surveying station for approaching the moon.

Luan, also chief commander of China's lunar orbiting program, was speaking at a lecture on the development of China's space flight and moon probe at the China University of Geosciences in Wuhan, central China's Hubei Province.

"During the last two years, scientists have made great achievement in moon probe research and the main engineering roadblock has been tackled", Luan said.

The programme is dubbed the "Chang'e Project," and the first lunar orbiter is named "Chang'e-I," referring to an ancient Chinese legend about the fairy Chang'e who flies to the moon.

With funding of 1.4 billion yuan (US$169 million), the orbiter, based on China's Dongfanghong III satellite platform and other mature satellite technology, will be launched atop a Long March 3-A rocket, according to Luan.

The satellite would obtain three-dimensional images of the lunar surface, analyze the content of useful elements and materials, and probe the depth of the lunar soil and the space environment between the earth and the moon.

The lunar probe project will be divided into three phases: sending a satellite to orbit the moon by 2007, landing an unmanned vehicle on the moon by 2010 and collecting samples of lunar soil with an unmanned vehicle by 2020.

"Only after we finish the three phases can we carry out the manned satellite project to probe the moon", said Luan.

Source: Xinhua News Agency

Email This Article

Related Links
- Mars News and Information at MarsDaily.com
Lunar Dreams and more

NASA Lunar Orbiter Mission Moves To Next Step
Greenbelt MD (SPX) May 19, 2006
NASA announced Thursday that its Lunar Reconnaissance Orbiter has completed its mission confirmation review and is ready to proceed to its implementation phase.







  • NASA Ames Hosting Sally Ride Science Festival
  • Russia To Double Soyuz Rocket Output And Boost Glonass GPS Constellation
  • International Workshop Eyes Cooperative Solar System Exploration
  • Japan space sneakers are ultra-high heels

  • Spirit Continues To Compile Panoramic Image
  • Opportunity Presses On Toward Victoria
  • Mars Drilling Tests Will Seek Knowledge And Resources
  • Spirit Takes A Winter Break From Travels But Remains Busy

  • Could NASA Get To Pluto Faster? Space Expert Says Yes - By Thinking Nuclear
  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program

  • Astronomers Catch Planet By Unusual Means
  • Simulation Tracks Planetary Evolution
  • Giant Earth-Like Planets Could Outnumber Jupiters
  • Planets In The Vortex

  • Blood-Compatible Nanomaterial
  • Supercomputing Center Advances Nanotechnology Science
  • Nanotube Sandwiches Could Lead To Better Composite Materials
  • Nanotechnology Used In Thirty Billion Dollars Worth Of Goods In 2005

  • Researchers Make Progress With Robotic Telesurgery
  • Deputy SG Talks About Future Of Air Force Medicine
  • Space Technology To Help Hospitals Contain Spread Of Avian Flu Infection
  • Stem-Cell Tech Improves Spinal-Cord Injury

  • Sea Launch To Orbit Next Satellite In June
  • Payloads Installed Atop Ariane 5
  • Arianespace Will Launch Eutelsat W2M
  • Kourou Launch-Site Supplier To Be Chosen In Late May

  • NASA Quietly Picking COTS Finalists
  • Orbital Awarded Contract for Definition of Hybrid Launch Vehicle Architectures
  • Nuclear Spacecraft Developers Borrow From Nature
  • Andrews Joins USAF Hybrid Launch Vehicle Effort

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement